NAES Corporation Home page

Web Name: NAES Corporation Home page

WebSite: http://www.naes.com

ID:347018

Keywords:

Corporation,NAES,page,Home

Description:


be_ixf; php_sdk; php_sdk_1.4.1113 msiy_2022; im_10; id_10; ih_01; imh_50; i_epoch:1.66539183939E+12ixf-compiler; ixf-compiler_1.0.0.0py_2020; pm_05; pd_14; ph_21; pmh_21; p_epoch:1.58951646329E+12link-block-publisher; link-block-publisher_link-block-publisher; bodystrpn_tstr:Thu May 14 21:21:03 PST 2020; pn_epoch:1.58951646329E+120 msbe_ixf; php_sdk; php_sdk_1.4.11https://www.naes.com/https://www.naes.com/ Skip to content 5,547 + Renewable MW Operated 96,000 + Conventional MW Operated 1,357 + Generation Resources 1000 + Construction Projects Contact Us

Renewables & Storage

Operations & Maintenance

Construction

Consulting

Compliance

Asset Management

Let's Talk Solutions

Contact Us

Learn About NAES

We are an independent services company dedicated to optimizing the performance of energy facilities across the power generation landscape. The more than 4,000 NAES team members apply deep experience in operations, maintenance, construction, engineering and technical support to build, operate and maintain both traditional and renewable resources. Ultimately, generating more than 50,000 MW of energy annually.

Learn More

What Does NAES Offer?

Optimizing the performance of a power-generating facility requires a conscientious application of technical expertise combined with business acumen. We focus on the fundamentals – safety, reliability, compliance and cost – as we strive to operate your plant the way it was designed and intended to be operated. We hire motivated people, train and qualify them, implement effective processes, drive high performance and seek continuous improvement.

Learn More

Featured Article

At NAES, we understand our clients want to stay up-to-date with the latest news. While we offer news about internal updates and changes, the team also recognizes the industry itself is changing daily. This is why NAES offers both internal and external news regarding the power plant industry. Here, you will find upcoming news about the NAES team as well as exciting changes from NERC, engineering services, drafting and technical services, and much more. If you would like to subscribe to the NAES newsletters, complete the form at the bottom of the page and stay ahead of the competition with your industry knowledge.

Learn More

Safety

Our NAES Safe™ program augments our comprehensive Safety Management System, which provides the tools to integrate safety into work planning and execution throughout the organization:

A Safety Policy that sets forth vision and values;Safety Principles that guide our decisions, planning and work performance;Safety Standards that are spelled out in the NAES Health and Safety Manuals for plant operations, construction projects and corporate offices;Safety Plans and Procedures that include site-specific safety plans and safety improvement plans for all plants and projects. Learn More

Join the Conversation

TwitterLinkedIn

Website design by Jordan Crown

‹ › ×Manage Cookie Consent We use cookies to optimize our website and our service.
Functional cookies Always active The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes View preferences {title} {title} {title} CAISO Generator Modeling Process and Data Requirements

Don’t wait until the last minute. You should allow time for at least one iteration with CAISO so that you are complete and deemed compliant before your deadline.

On August 1, 2018, CAISO introduced a revised Business Practice Manual for Transmission Planning Process (BPM), which includes new data requirements for interconnected generation resources within the ISO’s footprint. Section 10 of the BPM establishes revised data requirements and compliance procedures for all participating generators including non-NERC registered entities. While additional requirements have been placed on larger NERC registered facilities, these changes may pose an even greater burden to entities that have been exempt from NERC mandated modeling and protection requirements.

New data requirements include voltage and frequency protection models, power flow models, and in some cases, sub-synchronous resonance models. These models must be verified using criteria listed in the BPM, which can only be performed by entities with modeling software and knowledge of modeling practices.

NAES is prepared to assist entities with data aggregation, modeling, and testing to ensure compliance with CAISO’s data requests. The following links will allow entities to determine when to expect their individual data requests (phase) and what data will be required (category).

Business Practice Manual (BPM)

Entity Category and Phase Listing

CAISO Transmission Planning Website

TPL-007

TPL-007 establishes planning criteria for induced currents caused by geomagnetic disturbances. The standard is applicable to facilities using transformer(s) with a high side, wye grounded winding operated above 200 kV and can require both submittal of general geomagnetic data (R2) and thermal impact assessments (R6) depending on results of Planning Coordinator analysis.

VOLTAGE AND REACTIVE (VAR) STANDARDS

VAR-501-WECC

VAR-501-WECC requires applicable entities within the WECC region to confirm performance settings and characteristics of Power System Stabilizers (PSS). NAES provides physical testing and reporting services to address WECC’s specific PSS requirements.

PERSONNEL PERFORMANCE, TRAINING AND QUALIFICATIONS

PER-006

PER-006 requires Generator Operators to provide training to personnel who are responsible for the Real-time control of a generator. NAES has developed specific protection system training materials suitable for compliance with the Standard and provides this training both on and off site

PROTECTION AND CONTROL (PRC) STANDARDS

PRC-001

PRC-001 requires entities to coordinate protection system changes with other affected parties. NAES offers both procedural documentation and engineering services to establish the required coordination for both PRC-001 and PRC-027.

PRC-002

PRC-002 requires the installation and operation of disturbance monitoring equipment (DME) for applicable entities. NAES can assist with the design and installation of DME as well as ongoing compliance support.

PRC-019

PRC-019 requires applicable entities to show coordination between voltage regulating controls, limiters, equipment capabilities, and protection settings. NAES produces PRC-019 specific coordination studies for both traditional generators and renewable projects to establish compliance with the Standard.

PRC-023

PRC-023 requires load responsive protective relays be set according to criteria within the Standard to ensure settings do not limit transmission loadability. NAES provides full engineering analyses to maintain compliance with this Standard.

PRC-024

PRC-024 requires applicable entities to ensure generator protective relays do not trip within predefined frequency and voltage limits. NAES can complete protection settings analyses and provide compliance documentation that clearly identifies protection settings as they relate to NERC’s “no trip” zones.

PRC-025

PRC-025 establishes minimum settings requirements for load-responsive relays protecting generators, step up transformers, and auxiliary transformers. NAES utilizes predefined calculation options as well as simulations to determine a facility’s compliance status and development of new relay settings if required.

PRC-026

PRC-026 requires applicable entities to perform load responsive relay settings analyses based on criteria identified within the Standard. Entities are typically notified by the Planning Coordinator when an analysis is required. NAES performs all required studies to establish compliance.

MODELING, DATA, AND ANALYSIS (MOD) STANDARDS

MOD-025

MOD-025 requires Real and Reactive Power capability testing for individual generating units over 20 MVA or facilities with over 75 MVA of generation capacity. NAES offers site specific test procedures and/or complete onsite testing services to meet the requirements of this standard.

MOD-026

MOD-026 requires verification of excitation or volt/var control dynamic models through utilization of either system disturbances or physical testing. NAES offers full testing and modeling services to meet the requirements of this standard.

MOD-027

MOD-027 requires verification of governor or active power/frequency control dynamic models through utilization of either system disturbances or physical testing. NAES offers full testing and modeling services to meet the requirements of this standard.

TAGS:Corporation NAES page Home

<<< Thank you for your visit >>>

Websites to related :
Home | Mistex

  About usPartnersInvestorsFAQContactsLoginRegistrationWe've started. It will be very hot soon. Don't be on the sidelines join us.Trading in stocks and

Home / Chris Norman - Official S

  Please enable JS

Home - TPA - Tecnological proces

  HomeOur projectsAutomation ServicesElectrical engineering and designSoftware for the automation systemsAssemblage of the control cabinetsInstallation

Home - Ready Now Recovery

  Skip to content/*! elementor - v3.7.8 - 02-10-2022 */.elementor-widget-image{text-align:center}.elementor-widget-image a{display:inline-block}.element

Businessx Front Page - Strategic

  HomeAboutHistoryOur ServicesSmall Business AccountingPayroll PreparationIncome Tax PreparationStrategy SessionEstate &#038; Trust ConsultingOur TeamTe

Homepage - Clara Wichmann

   Logo - homepage men

Home - BBS Energy Works

  HomeAboutAbout BBSServicesPrenatal / ParentsNewborn / InfantChildrenAdultsPetsMethodologiesDevelopmental WorkEarly Reflex DevelopmentBrain Gym®Develo

Home - Ledgerock Golf Club - M

  

Homepage - Remacontrol

  ItaEngFraDeu Toggle navigation AziendaChi siamoLa nostra storiaAssistenzaProdottiSettori applicativiRete venditaItaliaWorldNews &#038; V